Plumbing modifications taking place on the 35th floor (36th floor Marketing) as indicated on the drawings.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Alterations to plumbing system in suite 1900 as per plans. No change to use, egress or occupancy.
Plumbing modifications taking place on the 4th floor as per plans filed herewith. No change in use, egress or occupancy.
Installation of plumbing fixtures and associated piping on the 1st floor for lobby cafe as per plans. No change to use, egress or occupancy.
At 7th floor tenant space, additions/modification to existing plumbing system as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of unit 3w. plumbing scope includes the removal and capping of existing fixtures and installation of new plumbing fixtures.
Modification/additions to existing plumbing fixtures and related piping as per plans filed herewith. No change in use, egress or occupancy under this application.
#9000 - Plumbing modifications in Popmart space. No change in egress, use, or occupancy.
Plumbing modifications taking place on the 8th floor (demolition), as per drawings filed herewith. no change in use, egress or occupancy.
Dep bathroom - plumbing work as per the plans filed herewith. no change to use, egress or occupancy.
Plumbing work on the 38th floor (Nuvation Bio) as indicated on drawings.
Plumbing modifications taking place on the Floors 11, 12 and 13 as per plans filed herewith. No change in Use, Egress or Occupancy.
Filing for interior reno of 4th floor ibo office as per plans submitted herewith.
Modification to existing plumbing system on 11th floor as per plans filed herewith. No change in egress, use, or occupancy.
Modification to existing plumbig fiixture and related piping as show on drawings. no change to use, egress or occupanyc.
Plumbing work for new restrooms at accessory pantry on roof terrace, as shown on plans filed herewith.
Plumbing fixtures installation and associated plumbing as per plans filed herewith. no change to use, egress, or occupancy.
Modifications to the existing plumbing system on the 32nd Floor (Moroccanoil Office) as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 33rd Floor (Moroccanoil Office) as per plans. No change to use, egress or occupancy.