Hereby filing to replace and install plumbing fixtures with related piping as shown on plans filed herewith. NO change to use, occupancy or egress.
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Install new: 1 sink, 1 funnel drain, 1 hwh non gas, 1 water filter, 1 water piping & 1 sanitary piping
Filing for plumbing and sprinkler work associated with interior renovation of sub cellar dolce vida as per plans submitted herewith.
Plumbing work as shown on plans.
Plumbing work as shown on filed plans
Plumbing Fixture changes as indicated on plans,
Filing for plumbing and sprinkler work associated with interior reno of 17th floor prebuilt office space as per plans submitted.
Plumbing work on the 21st floor (VRC) as indicated on drawings.
Plumbing Fixture changes as indicated on plans.
Plumbing work on the 10th floor (LB Pharma expansion) as indicated on drawings.
Plumbing modifications to include interior demo work as per plans filed herewith. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Plumbing modifications taking place on the 39th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Alterations to plumbing system as per plans. No change to use, egress or occupancy.
Install new: (2) sinks, (3) HWH, (1) Lav, (1) WC, (2) FD, (1) Chiller w/ IM, (1) IM and Replace (2) drinking fountains and associated CW/sanitary piping. on the 7th Floor as per pl…
Modification to plumbing fixtures
Removal of plumbing fixtures on the 17th floor as indicated on drawings.
Modifications to the existing plumbing system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Plumbing modifications taking place on the 40th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.