Modifications to the existing plumbing system on the 8th floor (HITT - Office Buildout) as per plans. No change to use, egress or occupancy
Alterations to plumbing system on 16th floor as per plans. No change to use, egress or occupancy.
Installation of plumbing fixtures for medical office as per plans filed herewith. No change in use, egress or occupancy under this application.
Install 1 wc, 1 lav, 6 sinks, 3 dishwashers, 3 water filters, 4 hwh non gas, 5 floor drains, 1 water piping & 1 sanitary piping.
Application filed for plumbing additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing work as shown on plans
Plumbing & sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
Removal and installation of plumbing fixtures with associated piping as per plans. No change to use, egress or occupancy.
Plumbing and Sprinkler modifications on floors Sub-Cellar and Cellar, 01, 02, 03, 04, 09, 10 as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing changes on the 7th, 8th and 9th floors as indicated on drawings.
Ansonia endoscopy asc reno - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.