A Plus Plumbing Corp
Permits (39)
Plumbing work on the cellar level (Spear Street Capital) as indicated on drawings.
Herewith filing for installing a Temporary sprinkler loop as per the plans. No change in use, egress or occupancy.
Filing for sprinkler work associated with the interior renovation of 11th & 12th floors for peerless clothing as per plans submitted herewith.
Herewith filed to modify existing sprinkler heads and associated assemblies to align with the new restaurant layout. plumbing scope: remove one sink and cap connections (new pl install filed under m01...
At subcellar, installation of new sprinkler heads and related piping as per plans filed herewith. no change to use, occupnacy, or egress under this application.
Related sprinkler/standpipe work for new 3-story building for school athletic facility as per plans filed herewith.
Filing herewith sprinkler work as per plans. no change in use, egress, or occupancy.
Modification to existing plumbing fixture and sprinkler systems as per plans,
Minor plumbing work at unit 6E.
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
Installation of all sanitary fixtures with associated piping, gas fixtures with associated piping and installation of septic system and storm water detention system.
Application filed for plumbing modifications/additions on the 32nd fl (suite 3203) as per plans filed herewith. no change in use, egress, or occupancy.
It is proposed the removal of gas piping, plumbing piping, and fixtures.
Install plumbing waste, vent and water piping and fixtures as shown on the plans. no changhe in occupancy, use or egress.
Application filed for sprinkler additions/modifications on the 33rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for sprinkler modifications/additions on the 32nd fl (suite 3203) as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy.
Plumbing work for bathroom renovation. Removal of bathtub, removal of one vanity, and relocation of existing shower.
Plumbing work for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19)
Modification of existing sprinkler system. no change to use, egress or occupancy.