A Plus Plumbing Corp
Permits (95)
Installation of all sanitary fixtures with associated piping, gas fixtures with associated piping and installation of septic system and storm water detention system.
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
Installation of all sanitary fixtures with associated piping, gas fixtures with associated piping and installation of septic system and storm water detention system.
Filing to udpate sprinkler head count on the 2nd & 3rd floor as per plans filed. no change to use, egress or occupancy.
It is proposed the removal of gas piping, plumbing piping, and fixtures.
Application filed for plumbing additions/modifications on the 33rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for plumbing modifications/additions on the 32nd fl (suite 3203) as per plans filed herewith. no change in use, egress, or occupancy.
It is proposed the removal of gas piping, plumbing piping, and fixtures.
Application filed for plumbing modifications/additions on the 32nd fl (suite 3203) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for sprinkler additions/modifications on the 33rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Install plumbing waste, vent and water piping and fixtures as shown on the plans. no changhe in occupancy, use or egress.
Application filed for sprinkler modifications/additions on the 32nd fl (suite 3203) as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for sprinkler modifications/additions on the 32nd fl (suite 3203) as per plans filed herewith. no change in use, egress, or occupancy.
Install plumbing waste, vent and water piping and fixtures as shown on the plans. no changhe in occupancy, use or egress.
Application filed for sprinkler additions/modifications on the 33rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Application is filed for the installation of new sprinkler heads (3) with service from existing sprinkler system; and for the installation of new gas equipment and piping as per plans filed herewith....
Application is filed for the installation of new sprinkler heads (3) with service from existing sprinkler system; and for the installation of new gas equipment and piping as per plans filed herewith....
Plumbing modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy.
Plumbing work for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19)
Plumbing work for bathroom renovation. Removal of bathtub, removal of one vanity, and relocation of existing shower.