Modifications to the existing sprinkler system on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
Hereby filing to install sprinkler heads with related piping for office renovation as shown on heads filed herewith.
Modification to existing plumbing systems and fixtures and sprinkler / standpipe systems and installation of new sprinkler heads as per plans filed herewith. 001, 005, 006, 008 C (…
Installation of a siamese extension at the Chamber Street sidewalk barricade as per the filed drawings. No change to use, occupancy or egress.