Sprinkler modifications taking place on the 7th floor as indicated on the drawings.
Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy.
Hereby filing to remove and relocate sprinkler heads for bathroom renovation with related piping as shown on plans filed herewith. No change to use, occupancy or egress.
Standpipe work related to Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms.
Additions /Modification to existing Standpipe system /Sprinkler and Plumbing system as per plans filed herewith. Installation of new aux. fire hose cabinets & associated piping. No…
Modifications to the existing sprinkler system on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
Hereby filing to install sprinkler heads with related piping for office renovation as shown on heads filed herewith.
Modification to existing plumbing systems and fixtures and sprinkler / standpipe systems and installation of new sprinkler heads as per plans filed herewith. 001, 005, 006, 008 C (…
Installation of a siamese extension at the Chamber Street sidewalk barricade as per the filed drawings. No change to use, occupancy or egress.