Advanced Plumbing Mech
Permits (49)
Modification of plumbing fixtures as per plans. no change to use, egress or occupancy filed under this application.
Modification of plumbing fixtures as per plans. no change to use, egress or occupancy filed under this application.
Hereby filing this application to propose a new laundry room located in the cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of occup...
Hereby filing this application to propose a new laundry room located in the cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of occup...
Hereby filing this application to propose a new laundry room located in the sub-cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of o...
Interior renovation (plumbing work) to removed (2)ecb violations #(39154717m,39154716k) in the existing commercial store. address on the violation is wrong (50 east 125street is the correct one). no c...
Interior renovation (plumbing work) to removed (2)ecb violations #(39154717m,39154716k) in the existing commercial store. address on the violation is wrong (50 east 125street is the correct one). no c...
Plumbing System Modifications and new installations related to Restaurant fit out.
Oil to gas conversion, install new boiler and indirect hw tank with reconnection to existing distribution in cellar.
Plumbing System Modifications and new installations related to Restaurant fit out.
Oil to gas conversion, install new boiler and indirect hw tank with reconnection to existing distribution in cellar.
New Boiler install to take place on the roof as per plans filed herewith. No change in use, egress, or occupancy.,
New Boiler install to take place on the roof as per plans filed herewith. No change in use, egress, or occupancy.,
Hereby filing this application to propose a new laundry room located in the cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of occup...
Hereby filing this application to propose a new laundry room located in the cellar as an accessory use to the building as per plans submitted. this app does not require a new or amended cert. of occup...
Plumbing work at 1st and 2nd floor as per plans filed herewith
Plumbing work at 1st and 2nd floor as per plans filed herewith
subsequent filing for plumbing work.
subsequent filing for plumbing work.
Plumbing and sprinkler modifications to accommodate alterations within the existing building as per plans.