Removal. replacement and reconfiguration of kitchen and bath appliances, fixtures, millwork and finishes. Reconfiguration of existing entry and corridor closets to accommodate new…
Filing for the installation of pipe scaffolding on behalf of contractor
Filing for the installation of sidewalk shed on behalf of contractor
Filing for the installation of construction fence on behalf of contractor
Construct new elevator building addition. Provide new HVAC units with associated piping and ductwork for new building addition and accessible bathrooms throughout the building.
Fn/ps401k - for temporary construction equipment(fence) submitting on behalf of contractor, related to job 321068205, . no change in use, occupancy or egress
Fn/ps29k for temporary construction equipment(fence) submitting on behalf of contractor, related with dob # b00842565 no change in use, occupancy or egress
Removal of existing roof membrane & insulation, prep & installation of new roofing membrane, insulation, flashings & accessories. temp removal & reinstall of rooftop fans & condens…
Ch/ps401k - for temporary construction equipment(chute) submitting on behalf of contractor, related to job 321068205, . no change in use, occupancy or egress
Ch/ps29k for temporary construction equipment(chute) submitting on behalf of contractor, related with dob # b00842565, b01096835, b01096893, b01096886 no change in use, occupancy o…
Upn/ps29k for underpinning submitting on behalf of contractor, related with dob # b00842565, b01096835 no change in use, occupancy or egress
Soe/ps29k for support of excavation submitting on behalf of contractor, related with dob # b00842565, b01096835 no change in use, occupancy or egress