Facade repairs as per plans filed herewith. No change in use, occupancy or egress.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of material hoist as indicated on the drawings.
Installation of material only hoists as per drawings. hoists shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Installation of material only hoist as per drawings. hoist shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this application.
Renovation of the pool area, including the construction of new pool, pool deck and associated structural features. No change in use, egress or occupancy.
Facade Repairs. No change in use, egress, or occupancy.
Filing for facade repairs as plans filed herewith. No change in use, occupancy or egress
Installation of (2) 600# to 1000# capacity electric material only hoists during bldg alteration, filed sep. hoists shall comply with chapter #33 of the nyc bc. no change in use, oc…
Installation of suspended scaffold during facade inspection/ repair and Hoist.
Installation of 600# to 1000# capacity material only hoists as per drawings. hoists shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this…
Installation of a suspended scaffold for Facade Inspection as per plan submitted. No change to egress or occupancy.
Installation of suspended scaffold during facade inspection / repair and Hoist