Permits (54)
Installation of temporary material hoist per plan submitted. work shall comply with 2022 building codes chapter:33. no change in use, egress and/or occupancy with this application.
Installation of temporary material hoist per plan submitted. work shall comply with 2022 building codes chapter:33. no change in use, egress and/or occupancy with this application.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Emergency temporary shoring installation at the parking garage cellar level to mitigate hazardous roof slab conditions and safeguard public. no change in use, egress or occupancy.
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of outrigger and material hoist for the facade repair work asper plan submitted.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of outrigger and material hoist for the facade repair work as per plan submitted.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of temporary sidewalk shed per plan submitted. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.