Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
installation of pipe scaffolding. no change in use, occupancy or egress. work shall comply with chapter 33 of nycbc.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
Install medium duty scaffolding as per plans. pipe scaffolding shall comply with chapter 33 of the 2022 nyc building code.
Installation of outrigger and materialhoist for the facade repair work asper plan submitted.
Installation of outrigger for the facade repair work as per plan submitted.
Installation of outrigger the facade repair work as per plan submitted.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
Installation of temporary material hoist per plan submitted. work shall comply with 2022 building codes chapter:33. no change in use,egress and/or occupancy with this application.
Installation of emergency heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022…
Facade repair which includes brick repointing,lintel replacement, brick replacement andsill replacement as per plans. no change inbuilding use, occupancy or egress.
Installation of temporary material hoist per plan submitted. work shall comply with 2022 building codes chapter:33. no change in use, egress and/or occupancy with this application.