Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
Installation of outrigger and material hoist for the facade repair work asper plan submitted.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
9th cycle FISP repairs. No change in use, egress or occupancy.
9th Cycle FISP Repairs. No change in use, egress or occupancy.
Installation of outrigger and material hoist for the facade repair work as per plan submitted.
Installation of temporary sidewalk shed per plan submitted. No change in use, egress and/or occupancy with this application.
Installation of emergency heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…