mechanical modifications associated with alt-co M01328972 for conversion of existing commercial 12-storey commercial building to mixed-use commercial and residential use on floors…
Interior demolition of 1st and 2nd floors as per plans, approx. 17,000 sqft. no change to use, egress or occupancy.
Filing herewith for temporary structural shoring in conjunction with renovation of existing school as per plans. No change in use, egress or occupancy.
Structural work in conjunction with NB M01264489-I1.
Filing herewith Structural work as per plans.
Replace existing air-cooled split unit with new ducted air-cooled split unit, new ductwork and air outlets
Minor demolition of the HVAC system on the 5th thru 10th floors as per plans. No change to use, egress or occupancy.
Removal of partitions, doors, ceilings and interior finishes on the ground, 5th thru 10th floors as per plans. No change to use. egress or occupancy.
Mechanical work in conjunction with NB M01264489-I1.
Filing herewith interior renovation to include new kitchen and cafeteria and multipurpose space as per plans.
Support of excavation filed in conjunction with NB M01264489-I1. INCLUDES SOLDIER PILES AND TIMBER LAGGING.
Horizontal enlargement of 1st and 2nd floors of existing building with minor interior work in adjacent spaces as shown on plans. Upgrading building to 1968 code construction classi…
Filing herewith mechanical work as per plans.
Structural modifications and framing on floors Cel, 1-12 and Roof as per plans filed herewith. No changes in use, egress or occupancy.
Structural framing and reinforcements on floors Cellar, Mez, 1-12 and Roof as per plans filed herewith.
Interior renovation of mechanical ductwork throughout. No changes in use, egress, or occupancy.
Proposed residential conversion of an existing 12-storey commercial building to mix-use commercial and residential use. No change in bulk or floor area.
Application filed for mechanical additions/modifications on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 2nd floor as per plans filed herewith. no change in use, egress, or occupanc…
Construction of new 1-story community facility building. HUB consultation 6/16/2025.