Application filed for mechanical additions/modifications on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 2nd floor as per plans filed herewith. no change in use, egress, or occupanc…
Construction of new 1-story community facility building. HUB consultation 6/16/2025.
Structural work - framing for new mechanical shaft enclosure, a new dunnage platform, and mechanical openings in existing load-bearing masonry walls. no change in use, egress, or o…
Structural work for horizontal enlargement of 1st and 2nd floor of existing building
Propose a new 9-story building for a community facility non-profit institution with sleeping accommodations - use group iii(a) as per plan. obtain new c of o.
Provide test caisson on site as per plans filed, application filed in conjunction with new building application m00696323. no change in use, occupancy, or egress.
Ground-Level Facade Work per plans: Storefront awning framing and connections. All work below 40ft. No change to egress, use or occupancy.
Sub-Slab Depressurization System Set as shown on plans filed herewith.
Lobby renovation, new hvac system integration, and front steps& portico repair and restoration. related ms, pl, and st filed separately. no change in use, egress, or occupancy.
foundation and structural work associated with the proposed earthwork and change of occupancy, as shown on plans filed herewith.
support of excavation as shown on plans filed herewith.
Partial demolition associated with the renovation of the existing building, as shown on the plans filed herewith.
Conversion of existing buildings to Bronx Green Jobs Center and associated interior and exterior work as shown on plans filed herewith.
structural work associated with the proposed renovation and change of occupancy, as shown on plans filed herewith.