Provide new fire protection system, system shall include wet sprinkler distribution, sprinklers heads and piping with hangers. provide water service connection to the existing 8 ci…
Subsequent filing for plumbing work in conjunction with storm drainage at existing ev charging station filed under application # b00582586. no change in use, egress or occupancy.
New sprinklers to replace existing sprinkler. connect to existing sprinkler riser. no changes to exterior
Install fire sprinkler system in the entire building i.a.w nfpa 13r 2007 edit, as modifed nyc bc 901 appendix q 104 as per plan. nb occupancy existing should be same as proposed. s…
Replacement, relocation, and removal of existing plumbing fixtures and gas equipment at kitchen, bath, & laundry areas.
Installation of fully sprinkler system as required per application. no change in use, occupancy & egress. related new building application 340770669-nb
Installation of fully sprinkler system as required per application. no change in use, occupancy & egress. related new building application 340770678-nb
Plumbing work filed in conjunction with renovation of ex. 2-family residence. install new plumbing fixtures and related piping per plans.
Plumbing work filed in conjunction with mix use commercial & residential building. replace existing plumbingfixtures on existing roughing. relocate shower.
Installation of sprinkler system for a 3-story, 3-family dwelling in conjunction with b01147007-i1.