Arsenal Scaffold Inc
Permits (292)
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with BC2022 chapter 33. No change in use, egress and/or occupancy under this application.
Installation of temporary roof protection over adjacent properties as per plans. roof protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applic...
Temporary roof / overhead protection as per drawings. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary loading dock platform as per drawings. loading dock platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary roof / overhead protection as per drawings. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary loading dock platform as per drawings. loading dock platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary shoring to support sidewalk vault as per plans filed herewith.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 7,100 lb single personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applicatio...
Installation of temporary roof protection, overhead protection and window protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occu...
Installation of 7,100 lb single personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applicatio...
Installation of temporary roof protection, overhead protection and window protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in use, egress or occu...
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary shoring to support sidewalk vault as per plans filed herewith.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary needle beams as per plans. needle beams shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.