Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
Install retaining wall as per plans, no change in use, egress or occcupancy
Install 8' high plywood construction fence
mechanical equipment will be used to assist with demolition from exterior, and chute will be built up to lower debris from floor to floor
mechanical equipment will be placed on grade, and chute will be installed to lower debris from floor to floor
mechanical means will be used to assist with exterior demolition. Chute will be built up to load out debris from floor to floor
mechanical equipment will be used from exterior and placed on grade. Chute will be built up to assist with loading out of demo debris
installation of construction fence