Boiler replacement
Hereby filing an 8000gallon fuel storage tank for a new generator
Fuel Tank integral to Generator
Filing herewith fuel-oil storage and piping system as per plans. Work associated with mechanical application M00981292-I1
New Installation of Oil and Gas Boiler as shown on plans
Modification of existing boiler as shown on plans
Installation of fuel tank connected to mobile trailer unit to provide temporary heat to the building.
Installation of boiler and oil burner to create mobile boiler unit. no change in use, egress or occupancy.
New chimney and breeching for existing boilers.
Replacement of chimney liner and draft controller. No change in use, egress or occupancy
Addition of chimney liner and draft fan. No change in use, egress or occupancy.
Installation of 3 new boilers as per plans filed herewith filed in conjunction with B00632209-I1.
Existing oil-fired boilers shall be demolished and replaced with new boilers. New boilers shall be installed in completely new Boiler pit.
New double wall chimney. new gas meter room. no change in means of egress use group or occupancy.
K358- fuel storage for generator.
P.S.004K:scope of work includes new emergency generator with integral double wall 275 gallons belly tank with rupture basin located on roof of the new building. This application is…
P.S.004K: FUEL STORAGE-Installation of Fuel Oil Transfer tank and transfer pump in Fuel Oil room at Cellar and Installation of Fuel Oil Tank (Belly tank) at generator. This applica…
rooftop emergency generator with fuel oil tank, piping, and transfer pumps
Replace boiler and gas/oil burner as per plans. filed in conjunction with laa# m01321391-i1. no change to use, occupancy or egress.
Herewith filing subsequent fuel storage document for NB generator