Mechanical modifications to take place on the 46th, 47th, and 48th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Floors listed as 48th…
Soe filed for new elevator in existing building foundation.
General Construction to take place on the 46th, 47th, and 48th Construction floor as per drawings filed herewith. No change in use, egress, or occupancy. (Floors listed as 48th, 49…
Filing for interior reno of 19th floor for amazon editors lab as per plans submitted herewith.
Filing for mechanical work associated with interior renovation of the 33rd floor polar office as per plans submitted herewith.
Modifications to the existing HVAC System: Installation of new supplemental AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - Supplemental AC Unit.) No chan…
Propose fit out on 34th floor and support for (2) folding partitions. No change in use, egress or occupancy.
Propose to perform interior renovations. No change in use, egress or occupancy.
Propose installation of VAV boxes, fan power boxes and associated ductwork and piping. Installation of supplemental A/C unit and associated ductwork and piping. No change in use, e…
Filing for interior renovation of the 33rd floor polar office as per plans submitted herewith.
Mechanical work on part of the 9th floor (Portage Point Partners) as indicated on drawings.
General construction work to include demo of existing & construction of new partitions, doors, finishes, ceiling,related construction, including existing elevator cab reno & core r…
Architectural work on part of the 9th floor (Portage Point Partners) as indicated on drawings.
Modification to existing mechanical system in conjunction with interior renovations at 20th floor. no change in use, egress or occupancy under this application.
Architectural work on part of the 8th floor (Portage Point Partners) as indicated on drawings.
Mechanical work on part of the 8th floor (Portage Point Partners) as indicated on drawings.
Filing herewith drawings indicating interior renovations on the 32nd floor (marketed as the 33rd floor). No change in use, egress, or occupancy under this application.
Interior renovation as per plans filed herewith.
Interior renovation at partial 9th floor including installation of interior non-load bearing partitions, ceiling systems, lighting, doors, millwork, flooring, and finishes as per f…
Filing herewith drawings indicating modification of the mechanical system on the 32nd floor (marketed as the 33rd floor). No change in use, egress, or occupancy under this applicat…