Clune Construction Co Lp
Permits (107)
Mechanical work on the 14th floor (Cornspring) as indicated on drawings.
Mechanical work on the 14th floor (Cornspring) as indicated on drawings.
Construction work on the 14th floor (Cornspring) as indicated on drawings.
Tenant fit out for Bank of America. No change to use, egress or occupancy.
Install new HVAC system for Bank of America.
Installation of new steel beams for atm machine support as shown on drawiings. no change to use, egress or occupancy.
Installation of new steel beams for atm machine support as shown on drawiings. no change to use, egress or occupancy.
Reinforcing framing to support ATM machine.
Architectural scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
Mechanical scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
Interior renovation for Chase Bank. No change to use. egress or occupancy.
Interior renovation for Chase Bank. No change to use. egress or occupancy.
Mechanical scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
Architectural scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
Reinforcing framing to support ATM machine.
Application filed for tenant fit out for educational facility at 2nd floor.
Mechanical work filed in conjunction with ALTCO. Application filed to supersede B01051703-S4.
Install new supply air ductwork with air outlets.
Interior renovations on teh 29th floor as per plans.
Mechanical work as per plans to include installation of one water cooled heat pump.