Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Minor interior construction, patching and repair of finishes in tenant spaces on the Cellar-9th and Roof as per plans (Hines Fire Alarm System Upgrade.) No change to use, egress or…
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
Minor interior demolition; Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 7th floor as per plans (Hines - Demo, Whitebox & Stair I…
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 7th Floor and Reinstall ductwork on the 6th Floor in relation to slab in…
Modifications to existing HVAC System: Remove ductwork, diffusers, AC units and associated equipment on the 1, 2, 5, 8, Roof as per plans (Demo & Whitebox.) No change in use, egres…
Minor interior demolition, removal of interior non-load bearing partitions and finishes on the 1, 2, 5th and Roof as per plans (Hines Demo & Whitebox.) No change to use, egress or…
Herewith filing for the installation of a new demising wall as reflected in plans submitted. No change in use, egress or occupancy is proposed under this application.
Structural modifications: Infill slab opening at an existing interior convenience stair on the 7th Floor as per plans (Hines - Demo, Whitebox, Infill.) No change to use, egress or…