Install foundations as per plans filed. subsequent filing to nb #m00625489.
Mechanical modifications on 3rd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
Nyulh - bay ridge - physician practice - mechanical modifications according to plans filed herewith. no change to use, egress or occupancy.
AHB EGEN Support of excavation to accommodate fuel oil tank replacement. All work as per plans.
Alteration type 1 filed as per plan provided.
Infill of existing skylight
Partial demolition as shown on drawings filed herewith.
Mechanical work being filed in conjunction with new building.
Remove existing mechanical equipment and ductwork and install new equipment, piping, and ductwork to accommodate the renovation of the 3rd floor MRI suite in the existing hospital…
Install new foundation for the proposed 17 story ambulatory care building as per plans filed herewith.
AHB IT Rm: Modification to interior partitions and finishes to accommodate alterations to the IT room within the existing hospital as per plans filed herewith. No Change to zoning,…
AHB IT RM: Modification of HVAC equipment and ductwork to accommodate alterations for the IT rooms within the existing hospital building as per plans. no change to use, egress or o…
Remove and install new partitions and finishes to accommodate renovation of the MRI Radiology suite on partial 3rd floor in the existing hospital as per plans filed herewith.
Mechanical scope of work in support of roof replacement and exterior restoration project.
Structural scope for Remove and replace 5th floor play roof, 6th floor stair D roof, and 7th floor penthouse structural slabs, associated parapets, selected masonry facade areas, a…
HSS Central Sterile: Modification to interior finishes to accommodate the sterilizing equipment replacements in the existing hospital building. No change to use, egress, or occupan…
Interior modifications on 3rd Floor of the Guggenheim Pavillion at Mount Sinai Hospital as shown on plans filed herewith. No change in egress, occupancy or use.
Structural modifications on 2nd Floor as per shown on plans filed herewith. No change in egress, occupancy, or use.
Remove and replace/reinstall existing mechanical ductwork, piping and equipment associated with areaway reconstruction and sub-basement waterproofing. Providing temporary ductwork…
Existing shoring assessment, modification and removal in coordination with interior and sidewalk level renovation for water infiltration remediation at Alexander Hamilton US Custom…