Dependable Mech Corp
Permits (64)
New storm and sewer connection to existing commercial building
Plumbing Fixture changes as indicated on plans.
Remove and install new plumbing fixtures and sprinkler lines and heads on partial 14th floor to accommodate the office renovation in the existing office building as per plans filed herewith only.
Install new plumbing fixtures at cellar, 1st, and 2nd floors in 1 family house as per plans.
Install new plumbing fixtures at cellar, 1st, and 2nd floors in 1 family house as per plans.
Install new plumbing fixtures: (2) WCs, (2) Lavatories, (2) HWHs, (2) sinks, (3) Funnel drains, (1) drinking fountain, (1) ejector pump and associated CW/sanitary piping on the Cellar Level as per pla...
Propose installation of new plumbing fixtures, sprinkler heads and associated piping. No change in use, egress or occupancy.
Plumbing Fixture changes as indicated on plans.
Propose installation of new plumbing fixtures, sprinkler heads and associated piping. No change in use, egress or occupancy.
Install new plumbing fixtures: (2) WCs, (2) Lavatories, (2) HWHs, (2) sinks, (3) Funnel drains, (1) drinking fountain, (1) ejector pump and associated CW/sanitary piping on the Cellar Level as per pla...
connection to the existing gas piping on the Roof to reconnect to the new RTU unit. Existing gas piping is being replaced with new 2 gas piping (from existing 2 meter in main gas service location.)
Modifications to the existing plumbing system in basement (Le Cafe) as per plans. No change to use, egress or occupancy.
connection to the existing gas piping on the Roof to reconnect to the new RTU unit. Existing gas piping is being replaced with new 2 gas piping (from existing 2 meter in main gas service location.)
Removal and installation of pluming fixtures and related piping as shown on drawigs. no change to use, egress or occupancy.
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF 28th FLOOR GALLET DRYER BERKEY OFFICE AS PER PLANS SUBMITTED HEREWITH.
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF 28th FLOOR GALLET DRYER BERKEY OFFICE AS PER PLANS SUBMITTED HEREWITH.
Removal and installation of pluming fixtures and related piping as shown on drawigs. no change to use, egress or occupancy.
Plumbing modifications taking place on 9th floor as per plans filed herewith. no change in use, egress, or occupancy.
Install new piping, new plumbing fixtures and appliances as part of renovation for tenant spaces at 11th floor of existing commercial space including work at existing risers and shaft walls. No change...
Filing herewith plumbing work as per plans filed herewith. No change to use, egress or occupan