Removal and installation of plumbing fixtures and related piping as per drawings herein. Renovation of existing of partial commercial floor sprinkler layout to reflect the new arch…
Plumbing work for Cafe space as shown on plans filed herewith. No change to use, egress or occupancy.
Filing herewith drawings indicating modification of the Plumbing on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under this appl…
Plumbing work in conjunction with the General Construction Alteration DOB# Q01319939-I1
Filing herewith drawings indicating modification of the Plumbing on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under this appl…
Filing herewith plumbing modifications includes on the cellar, 1st and 2nd floor as indicated. no change in use egress or occupancy.
Install gas-fired boiler at 6th floor. filed in conjunction with alt. type 1 no. 101508619. no change to use, occupancy or egress under this application.
Plumbing work related to interior renovation of unit 801-2.
Modification to Plumbing relocate and replace plumbing fixtures and related piping all as per plan
Plumbing modifications in conjunction with gc work includingrenovation of bathrooms on 2nd floor & new washer / dryer.
Install (2) new gas grills and related piping at residential recreation roof. no change to use, egress or occupancy. related alt-co #m01322541-i1.
Modifications to the existing Plumbing fixtures on the 5th floor as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
plumbing work associated with renovation of existing 1 story commercial space
Replace plumbing fixtures with new at existing roughing (1 lav, 1 wc); relocate plumbing fixtures with new (1 sink); install new plumbing fixtures at new roughing (1 shower, 1 dw);…
Relocate plumbing fixtures with new (1 lav, 1 wc); install new plumbing fixtures (1 sink, 1 f.d.) at 1st floor.
Modifications to the existing plumbing systems on the 3rd floor as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Installation of new plumbing fixtures on the 2nd floor as per plans submitted herewith. No Change to use, occupancy, or egress.
Modifications to the existing plumbing system on the 13th floor (Buildout) as per plans. No change to use, egress or occupancy
Application to propose at first fl (1) 3 piece bath, (1) Res sink, (1) Gas stove. 2nd and 3rd floors propose (2) 3 piece bath, (2) Res sink and (4) Gas Stove. Installation of 7 com…