Removal and installation of sprinkler heads and related piping as shown on drawings. no change to use, egress or occupancy.
Installation of a new sprinkler system on the 9th floor as per plans. No change to use, egress or occupancy.
Sprinkler modifications on the 4th & 5th floors as per plans filed here with. no change in use, egress or occupancy.
sprinkler modifications taking place on the 10th Construction / 11th marketing floor as per plans filed herewith. No change in use, egress or occupancy
Nyu langone health - fgp rothman expansion - sprinkler modifications as per plans filed herewith. no change in use, egress, or occupancy.
Filing for sprinklers interior alteration for tenant fitout as per plans no to change use egress or occupancy
Modifications to sprinkler system for apt 6 renovations.
Modifications to the existing Sprinkler system on the 13th and 14th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Sprinkler Modifications on the 4 & 5th floors as per plans filed herewith. no change in use, egress or occupancy.
Plumbing and Sprinkler work in conjunction with renovation of Suite 405. No change to use, egress or occupancy.
Sprinkler system modifiction including new sprinkler heads installation as per plans filed herewith. no change to use, egress, or occupncy.
Modifications to the existing sprinkler system (Lobby Renovation) as per plans. No change to use, egress or occupancy.
Filing herewith drawings indicating modification of the Sprinkler System on the 17th floor construction (marketed as the 18th floor). No change in use, egress, or occupancy under t…
Installation of new sprinkler heads, temporary sprinkler heads and related piping as shown on drawings. no change to use, egr3ess or occupancy.
Filing for plumbing and sprinkler work associated with interior demo of 3rd through 7th floors as per plans submitted herewith.
Sprinkler and standpipe work in conjunction with Alt-CO M01220723-I1.
Sprinkler work for cafe space as shown on plans filed herewith. No change to use egress or occupancy.
Filing herewith drawings indicating modification of the Sprinkler System on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under t…
Filing herewith drawings indicating modification of the Sprinkler System on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under t…