Dependable Mechanical Cor
Permits (62)
Filing to modify existing Automatic Sprinkler. Sprinkler system is designed as per NFPA13 as modified by NYC BC appendix Q Scope is only for Commercial & office Building North Cafeteria on 2nd and 8th...
Filing to modify existing Automatic Sprinkler. Sprinkler system is designed as per NFPA13 as modified by NYC BC appendix Q Scope is only for Commercial & office Building North Cafeteria on 2nd and 8th...
Remove and install new plumbing fixtures and sprinkler lines and heads on partial 14th floor to accommodate the office renovation in the existing office building as per plans filed herewith only.
Replacement of existing sprinkler service fire pump in kind capacity.
Sprinkler head changes as indicated on plans.
Propose installation of new plumbing fixtures, sprinkler heads and associated piping. No change in use, egress or occupancy.
Replacement of existing sprinkler service fire pump in kind capacity.
Modifications to the existing Sprinkler System: Installation of (10) new sprinkler heads on the Cellar and (22) heads on the 1st Floor and associated piping as per plans (Retail Space.) No change to u...
Modifications to the existing Sprinkler System: Installation of (10) new sprinkler heads on the Cellar and (22) heads on the 1st Floor and associated piping as per plans (Retail Space.) No change to u...
Replacement of existing sprinkler service fire pump in kind capacity.
Filing herewith drawings indicating modification of the Sprinkler System on the 5th floor. No change in use, egress, or occupancy under this application.
Filing herewith drawings indicating modification of the Sprinkler System on the 5th floor. No change in use, egress, or occupancy under this application.
Modification to existing sprinkler system and related piping and installation of temporary sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Sprinkler work (melius) as indicated on plans. no change in use,egress or occupancy.
Sprinkler work (melius) as indicated on plans. no change in use,egress or occupancy.
Modification to existing sprinkler system and related piping and installation of temporary sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Proposing work for new tenant space - remove (26) sprinkler heads on 1st Fl. Install (1) sprinkler head in Cellar, Install (33) sprinkler heads on 1st Floor, (1) 1st floor mezzanine all with associate...
Proposing work for new tenant space - remove (26) sprinkler heads on 1st Fl. Install (1) sprinkler head in Cellar, Install (33) sprinkler heads on 1st Floor, (1) 1st floor mezzanine all with associate...
Modifications to the existing Sprinkler system on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Interior demo of the existing plumbing fixtures and sprinkler system with temp loop on the 3rd floor as per plans submitted herewith.