Modification to existing sprinkler system and related piping and installation of temporary sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Modification to existing sprinkler system and related piping and installation of temporary sprinkler heads as shown on drawings. no change to use, egress or occupancy.
Sprinkler work (melius) as indicated on plans. no change in use,egress or occupancy.
Proposing work for new tenant space - remove (26) sprinkler heads on 1st Fl. Install (1) sprinkler head in Cellar, Install (33) sprinkler heads on 1st Floor, (1) 1st floor mezzanine all with associate...
Proposing work for new tenant space - remove (26) sprinkler heads on 1st Fl. Install (1) sprinkler head in Cellar, Install (33) sprinkler heads on 1st Floor, (1) 1st floor mezzanine all with associate...
Modifications to the existing Sprinkler system on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Interior demo of the existing plumbing fixtures and sprinkler system with temp loop on the 3rd floor as per plans submitted herewith.
Modifications to the existing Sprinkler system on the 4th floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Interior demo of the existing plumbing fixtures and sprinkler system with temp loop on the 3rd floor as per plans submitted herewith.
Plumbing and Sprinkler Demo and installation of Temp Sprinkler Loop on the 2nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Plumbing and Sprinkler Demo and installation of Temp Sprinkler Loop on the 2nd floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Installation of sprinkler system as per plans filed herewith.
Modifications to the existing standpipe on the 32nd Floor, as per plans. No change to use, egress, or occupancy.
Modifications to the existing sprinkler system on the 31st - 33rd Floors as per plans. No change to use, egress, or occupancy.
Installation of sprinkler system as per plans filed herewith.
Filing herewith drawings indicating modification of the Sprinkler System on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under this application.
Filing herewith drawings indicating modification of the Sprinkler System on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under this application.
Plumbing piping and new fixtures, and modifications to sprinkler piping and installation of sprinkler heads on partial 28th floor in the existing office building.
Plumbing piping and new fixtures, and modifications to sprinkler piping and installation of sprinkler heads on partial 28th floor in the existing office building.
Installation of temporary standpipe system in conjunction with BIS Alt I #121205579 as per plans filed herewith.