Plumbing modifications taking place in the cellar, 1st floor, and 3rd floor as per drawings filed herewith. no change in use, egress and occupancy.
Plumbing modifications taking place on floors cel,1-11, 13-16, 20, 21, as per drawings filed herewith. no change in use, egress or occupancy.
Renovation of apartment #15fg, 301 east 62nd street, new york, ny 10065, with kitchen and bathroom renovations
Cap remove piping per plans. new fixtures and piping per plans.
Modification of plumbing piping at 6th floor and plumbing piping + fixtures at 7th floor as shown on plans
Plumbing work to apt. 1a, 1c, 1d, 2a, 2c, 2d, 2e, 3c, 3d, 4a, 4b, 4d, 4e, 5a, 5b, 5c 5d and 5e. alterations to include new, removed, and replaced plumbing fixtures. no change to zo…
Plumbing work in conjunction with interior renovation of existing space for Unit 23A. No change to use, egress, or occupancy.
Plumbing work proposed for an existing apartment. No change of use, occupancy or egress.
Plumbing word filing in conjunction of apartment #8A renovation
Plumbing System modifications and installations related to enlargement.
Filing herewith for the modifications to existing systems at existing units on 7, 8, 9 floors
Replacement of plumbing fixtures on existing rough-in, modifying existing gas for space heating boiler and water heater replacments and roof drains and backwater valve as per plans…
Replacement of plumbing fixtures on existing rough-in, modifying existing gas for space heating boiler and water heater replacments as per plans filed herewith. no change in use, e…
Plumbing work associated with alteration of proposed restaurant.
Filing for plumbing and sprinkler renovations as per plans filed. No change of use, egress or occupancy.
Filing for the plumbing work in conjunction with the renovation of the Apt# PHB.
Plumbing fixtures instalation and associated piping as per plans filed herewith. no change to use, egress, or occupancy.
Plumbing work during interior demo and white box construction on 9th floor