installation of piles and grade beams
site prep work and installation of privacy fence
installation of non-accessory Electrical Energy Storage Equipment and associated accessory equipment filed in conjunction with S01112983
Site preparation, installation of concrete pads and privacy fence. no change to occupancy, use or egress filed in conjunction with 53-05 46th street q01010936
Temporary construction fence.
This project involves supplying temporary generator trailers with fuel gas to serve as primary power during scheduled maintenance on the existing main generators. The scope of work…
installation of temp construction fence
installation of lifted concrete pads and BESS (Battery energy Storage System) Units
installation of a 17'-0 curb cut with splays
Solar canopy installation. canopy structure application submitted under job# s01122466-i1.
Solar canopy installation. canopy structure application submitted under job# s01122455-i1.
Installation of ESS (Battery energy Storage system) units