Installation of foundation for 2 hour fire-rated perimeter wall.
Installation of bess units ,ess tax
Installation of bess, ess tax
Installation of temp construction fence
Installation of battery energy storage system (ess) in osp as per plans. ess system is located in an enclosed area with no accessory use, therfore, must be filed as alt-co
Installation of battery energy storage system (ess) in osp as per plans. ess sysyem is located in an enclosed area with no accessory use, therfore, must be filed as alt-co
installation of non-accessory Electrical Energy Storage Equipment and associated accessory equipment filed in conjunction with S01112983
installation of piles and grade beams
site prep work and installation of privacy fence