Harrow Ny Inc
Permits (64)
Subsequent filing for mechanical work in conjunction with ot job#m01305912-i1. no change in use, egress, or occupancy.
Interior renovation of hotel units on the 17th, 18th, 19th, 20th, & 21st floors. partition changes and cosmetic work as per plans. no change in use, occupancy or egress.
Interior renovation of hotel units on the 11th, 12th, 14th, 15th & 16th floors. partition changes and cosmetic work as per plans. no change in use, occupancy or egress.
Proposed interior renovation of existing 2nd, 3rd, 4th & 5th floor. no change in egress, use or occupancy.
Propose interior renovation on existing 6 story building, constructions works as per plan.plumbing work to be filed under separate application. no change on egress use or occupancy.
Subsequent filing for mechanical work in conjunction with ot job#m01305912-i1. no change in use, egress, or occupancy.
Interior renovation of apartments 1, 2,3 & 4. No change to use, occupancy or egress under this application.
New heating system, bathroom and kitchen exhaust fans in apartments 1, 2, 3 & 4.
Interior renovation of apartments 1, 2,3 & 4. No change to use, occupancy or egress under this application.
New heating system, bathroom and kitchen exhaust fans in apartments 1, 2, 3 & 4.
Mechanical work to renovate units #1r, 1l, 2r, 2l, 3r, 3l, 4r, 4l &roof. no change to use, egress or occupancy
Mechanical work to renovate units #1r, 1l, 2r, 2l, 3r, 3l, 4r, 4l &roof. no change to use, egress or occupancy
Interior renovation work to units #2l and 2r at 2nd floor & renovate common hallway from cellar to 002, include removing and installing new interior non-load bearing partitions, lighting and finish wo...
Interior renovation work to units #4l and 4r at 4th floor, include removing and installing new interior non-load bearing partitions, lighting and finish work. no change to use, egress or occupancy.
Interior renovation work to units #4l and 4r at 4th floor, include removing and installing new interior non-load bearing partitions, lighting and finish work. no change to use, egress or occupancy.
Interior renovation work to units #2l and 2r at 2nd floor & renovate common hallway from cellar to 002, include removing and installing new interior non-load bearing partitions, lighting and finish wo...
Minor interior reno of comm spaces within the existing commercial building including the removal of existing floor & wall finishes as per the drawigns filed herein. existing fire ratings & fire divisi...
Minor interior reno of comm spaces within the existing commercial building including the removal of existing floor & wall finishes as per the drawigns filed herein. existing fire ratings & fire divisi...
Mechanical work associated with full interior renovation of three apartments in 3-story building. no change in occupancy, use or egress.
Mechanical work associated with full interior renovation of three apartments in 3-story building. no change in occupancy, use or egress.