Alterations - ALTERATIONS TO EXISTING LAB. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGN...
Alterations - INSTALL 2 WATER HEATERS with 2 storage tanks and new mixing valve.
Addition and/or Alterations - FOR THE INSTALLATION OF A NEW DUCTLESS HVAC SYSTEM AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
Alterations - Replace sump pump.
Alterations - ALTERATIONS TO EXISTING COMMERCIAL BUILDING. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENT...
Addition and/or Alterations - FOR THE INSTALLATION OF AN APPLIANCE TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVE...
Addition and/or Alterations - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FO...
Addition and/or Alterations - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL...
Alterations - DEMO & REPLACE 1 SINK.
Addition and/or Alterations - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL...
Addition and/or Alterations - DEMOLITION AND INSTALLATION OF MECHANICAL EQUIPMENT IN AN EXISTING HOSPITAL BUILDING (FOUNDERS BUILDING) INCLUDING ASSOCIATED PIPING, VALVES, INSULATION AND SUPPORTS AS P...
Addition and/or Alterations - FOR ALTERATIONS TO AN EXISTING HVAC SYSTEM TO INSTALL NEW GRDs AND ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND PHC AND...
Addition and/or Alterations - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL...
Alterations - REPAIR/REPLACE 6" WATER DISTRIBUTION PIPE.
Alterations - REPLACE 21 FIXTURES *WITHOUT PIPING**
Alterations - REPAIR/REPLACE CT & FAI.
Addition and/or Alteration - FOR LEVEL II ALTERATIONS TO INCLUDE EXTERIOR RAMP, NEW PARTITIONS, DOORS, FIXTURES, FURNISHING, EXTERIOR STAIRS, AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR ANY M...
Alterations - Add 1 new Sink
Alterations - Add 3 sinks, waste and water piping to existing space.
Addition and/or Alterations - FOR THE REPLACEMENT OF SEVEN (7) ROOFTOP COOLING TOWERS AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC. SEE BUILDING PERMIT CP-2025-006422 FOR ASSOCIATED STRUCTURA...