Plumbing work filed to renovate kitchen and bathroom (enlargement) on first floor; Removals at cellar, legalization of three pieces bathroom in order to resolved WWP and Violations…
Herewith filig for plumbing work at apt# 9 & 10 in an existing 6 storybuilding w/basement.
Plumbing work for apt 6e as per plans filed herewith. general construction work filed under separate dob now application. no change to egress, use or occupancy.
Demo of PL fixtures at 3rd, 6th and 8th floors and new fixtures at the 3rd and 5th floors
Plumbing work related to apartment renovation as per plans filed herewith.
Installation of new plumbing fixtures within apartments #1a and #1b on the first floor. no change in use, egress or occupancy.
Remove shower & bathtub from basement bathrooms, remove 1 sink from basement, remove gas stove.
A.remove partition walls.b.remove shower cellar bathrooms.resolve ecb/oath violations (15). resolve dob violations (7). e.add three washers and dryers to cellarf.no change in use,…
Plumbing work limited to renovation of Apt #4 (Second Fl); Kitchens and Bathrooms.
Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application.
Plumbing scope of work in-conjunction with general construction interior renovation application. no change to use, egress or occupancy
Install non-residential cooking range at first floor store, sink & grease trap to use restaurant
Plumbing work at exist. (4) apartments units on 2nd & 3rd floors; new apartment on first floor & cellar space, (5 bathrooms and 5 kitchens); boiler & meter rooms on cellar, scope o…
Application is being filed for ecb violations correctional work. remove cellar floor partitions, illegal kitchen & legalize 3 fixture bathroom to comply ecb violation #34424559l. n…