Plumbing and sprinkler work in conjunction with Alteration Type I gut reno/enlargement. No change to use, egress or occupancy under this PL/SPK application.
Plumbing and sprinkler work inconjunction with alt1 application #123900939
Install new bottle filler and connect waste, vent, and cold water to existing piping located above the 2nd finished floor
Selective removals/disconnections: 5-WC, 2-Urinals, 2-Lavatories and Associated Valves; Installation of: 4-WC, 2-Chair Carries, 5-Flushometers, 1-Urinal, 2-Lavatories, 2-Wall Carri…
Filing plumbing work as per plan filed herewith. Related applications are filed under separate application in DOBnow. No change use, egress, and occupancy under this application.
Connect replacement gas-fired boilers to existing gas piping as per plans. no change to use, occupancy or egress.
Proposed removal and replacement of (2) DHW heaters and associated recirculation pumps, with connection of new gas piping with RTUs, DHWs and existing boilers. All as per plans fil…
Remove existing drinking fountain and related piping.
Plumbing fixtures replacement in dressing rooms and bathrooms, including drinking fountains and sump pums replacement.
M520_Remove existing water fountain and replace with new bottle filler. For new Hydroponics Lab, provide new sinks, trap primer, floor drains, hose reels, hoose bibb, reverse osmos…
Existing hvac units gas line disconnect and brance piping replacement and reconnect gas line with new hvac unis in roof area building a, b and c.