Modification to the existing HVAC system on the 8th floor as per plans (Demolition). No change to use, egress or occupancy.
At 25th floor tenant space, installation of interior partitions and finishes as per plans filed herewith. no change in use, egress, or occupancy.
At 25th floor tenant space, additions/modification to existing mechanical system as per plans filed herewith. no change in use, egress, or occupancy.
At 7th floor tenant space, additions/modification to existing mechanical system as per plans filed herewith. no change in use, egress, or occupancy.
At 7th floor tenant space, installation of interior partitions and finishes as per plans filed herewith. no change in use, egress, or occupancy. related job #s: m01303710,m01303715…
Structural modifications/reinforcements added for a portion of the framing structure between 6th & 7th floor for interior convenience stair. additional steelwork for stair construc…
Filing for mechanical work associated with interior reno of 19th floor summit tx office as per plans submitted herewith.
Modifications to existing mechanical system as per plans filed herewith.
Interior renovation as per plans filed herewith. No change in use, egress or occupancy.
Filing for interior reno for 17th floor prebuilt office space as per plans submitted herewith. no change to use, egress, or occupancy.
Modification of mechanical systems as per plans filed herewith. No change in use, occupancy or egress.
Interior non-structural demolition of existing office tenant fit-out. scope of work includes removal of existing non-load-bearing partitions, ceilings, finishes, and partial demo o…
Mechanical modifications as indicated on plans. no change in use, egress or occupancy.
Partial floor interior alteration. removal of non-load bearing partitions, ceilings and finishes. installation of newnon-load bearing partitions, ceilings, finishes and millwork.wo…
Removal and instillation of interior non load bearing partitions and related finishes. filed in conjuction with new building application 121209192. mpp 47.
Modification to existing Mechanical System as per plans filed herewith. No change in use, egress or occupancy under this application.
Steel framing for slab openings on the 33rd and 34th floors (EQT) as per plans. No change to use, egress or occupancy.
The scope of this project is interior build-out of tenant space including demo of existing construction, new construction and installation of partitions, floor and wall finishes, d…
Removal and installation of ductwork ,diffusers ,fans and related mechanical piping. no change to use, egress or occupancy.
Removal of interior non-load bearing partitions, doors, flooring and installation of a new interior partitions and door. Ceiling patching and electrical relocations as required. No…