Icon Interiors Inc
Permits (102)
Mechanical modifications taking place on the 18th (19th floor marketing) floor as per drawings filed herewith. no change in use, egress or occupancy.
Mechanical modifications taking place on the 18th (19th floor marketing) floor as per drawings filed herewith. no change in use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
Infill of existing slab opening at 23rd floor.
Mechanical work as shown on plans
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Architectural changes on the 7th, 8th and 9th floors as indicated on drawings.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
Infill of existing slab opening at 23rd floor.
Mechanical work as shown on plans
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Architectural changes on the 7th, 8th and 9th floors as indicated on drawings.
Mechanical changes on the 7th, 8th and 9th floors as indicated on drawings.
Herewith filing for structural modifications on the ceiling of the 50th floor in conjunction with interior renovations per plans. no change in use, occupancy or egress under this application.
Provide slab infill and support on 7th floor
Mechanical changes on the 7th, 8th and 9th floors as indicated on drawings.
Herewith filing for structural modifications on the ceiling of the 50th floor in conjunction with interior renovations per plans. no change in use, occupancy or egress under this application.
Provide slab infill and support on 7th floor
Modifications to the existing HVAC system on the 45th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing HVAC system on the 45th floor as per plans. No change to use, egress or occupancy.