Filing of hydraulically calculated sprinkler system (with less than 30 heads filed under plumbing work-type) for a 3-story, 1 family building. For all architectural and zoning aspe…
Filing of hydraulically calculated sprinkler system (with less than 30 heads filed under plumbing work-type) for a 3-story, 2 family building. For all architectural and zoning aspe…
Plumbing work related to general construction
Provide new plumbing, standpipe, and sprinkler system in conjunction with NB# X01213692.
Filed herewith plumbing work type in conjunction with application #q01337680-i1
Plumbing work in apt 6h as per plans. no change in use, occupancy, or egress.
Hereby filing plumbing work at 5th floor unit 5h & 5g as per plans
Plumbing work in conjunction with GC application #X01323493-I1
Plumbing work in apt 6l as per plans. no change in use, occupancy, or egress.
Proposed plumbing for 2 story; one-family new building filed in conjunction with gc# q00722567
New plumbing and gas from cellar to 3rd floor.
Cellar: 2 floor drains, 2 toilet fixtures, 2 hot water heater, gas dryer, wash machine, and sink. 1st floor: 6 bathroom fixtures, 1 kitchen sink, 1 dishwasher. 2nd floor: 6 bathroo…
Replace one gas meter, add 2 piece bathroom in cellar, add 3 piece bathroom to 1st floor bedroom 2.