John Evan Contracting Cor
Permits (126)
Fence application filed in conjunction to alt1
Filing for fence application in conjunction to atl1
Job filed interior renovation residential units from cellar to 2nd floor, including new non-load bearing partitions, wood floor,new paint and restore illegal enlargement and roof to original condition...
St application hereby filed in cojuction to job number b01263135
Job filed interior renovation residential units from cellar to 2nd floor, including new non-load bearing partitions, wood floor,new paint and restore illegal enlargement and roof to original condition...
St application hereby filed in cojuction to job number b01263135
To correct violation 39166552L. Renovation of the commercial space to remove the existing running ramp and install a new decking system and condensers, etc. No change of use, egress, or occupancy.
To correct violation 39166552L. Renovation of the commercial space to remove the existing running ramp and install a new decking system and condensers, etc. No change of use, egress, or occupancy.
shoring installation to support excavation along perpendicular property line at 1310 commonwealth avenue
shoring installation to support excavation along perpendicular property line at 1310 commonwealth avenue
Interior renovation of existing commercial space to replace commercial cooking equipment, commercial hood, walking cooler, counter table, etc. No Change of use, egress or occupancy.
Interior renovation of existing commercial space to replace commercial cooking equipment, commercial hood, walking cooler, counter table, etc. No Change of use, egress or occupancy.
Ms applciation herby filed in conjuction to job number b01263135
Fo/ea application hereby filed in conjuction to job number b01263135
Ms applciation herby filed in conjuction to job number b01263135
Fo/ea application hereby filed in conjuction to job number b01263135
Perform emergency repair work at Masonry parapet wall & Brick cracks at the front facade ( Exp 1) as per approved plans. No change in use, egress, or occupancy under this filing
Installation of VRF systems to provide cooling and heating offices, exhaust fans for toilets, installation of makeup air unit and removal of exist. toilet exhaust system as per plan, filed in conjunct...
Installation of a Sub-Slab Depressurization System below the new building slab, riser piping through the building, and a discharge pipe above the roofline.
Front entrance relocated, new porch installed