Cap and remove 1 range and 1 tub, relocate 1 sink, 1 wc, 1 lav, 1 new washer , 1 new dw, 1 new shower
Hereby filing for the renovation of unit 3g (installation of plumbing fixtures). no change in use, egress or occupancy.
File pl & sp worktype in conjunction with nb job#q00964899
Repair / replacement of existing house trap for existing tub installation. this work is being filing in conjunction with dob now application no. m01357524-i1. no change in use, occ…
New plumbing fixtures in existing locations in kitchen and bathroom and relocated powder room.
Interior renovation of two-family house with plumbing work: install new kitchenette and bathroom fixtures; new boilers and hot water heaters on cellar as per plan. no change in use…
1 new water closet, 1 new lav.
Renovation of existing commercial space on partial first floor with plumbing work: new hand sink, 3-comp. sink and ice maker in 1st floor as per plan; no change in use, egress or o…
relocate 1 sink, 1 wc, 1 lav, 1 new washer, 1 new shower, cap & remove 1 tub
Renovation of existing apartments 7F and 7G. Remove and construct partitions and flooring. Remove and install plumbing fixtures as per plans. No change to use, egress or occupancy.
Install (7) new boilers for existing 5-family dwelling and (1) commerical store in cellar as per plan. no change in use, egress or occupancyunder this application.