Structural, foundation, earthwork on the cellar and 1st floor as indicated on drawings
Filing herewith interior demolition on the 41st to 44th FL. (39th to 42nd FL. Construction, 41st to 44th FL. Marketing) as per plans filed herewith. No change to use, egress or occ…
Job was accepted to hub at consultation on 7/18/23. proposed change of use from ug 3 & 4 to ug v & viii. horizontal enlargement at 6th floor & roof. interior and exterior renovatio…
Filing herewith mechanical demolition work as per plans filed herewith. (39th to 42nd Construction FL., 41st to 44th Marketing FL) No change to use, egress or occupancy.
CUNY QUEENS HALL LIBRARY Renovation Branch ductwork to be reconfigured to accommodate the new layout within the are of work. Existing mechanical equipment to remain. Existing pneum…
Filing herewith for Structural work as per plans submitted.
CUNY QUEENS HALL LIBRARY Renovation to existing office suites, removal of existing walls, finishes, none code compliant stairs and lighting. Installation of newly reconfigured wall…
Modifications to the existing system to accommodate new layout.
Mechanical work on 25th & 26th floors as shown on plans filed herewith. no change in use, egress or occupancy under this application
Mechanical work associated with Alt-CO to partially convert existing office building to residential use.
Filing herewith for Structural work as per plans. This includes the support of movable partition supported off 25th floor. No change to use, egress or occupancy.
Filing herewith for removal, I installation, and modification of the existing mechanical system as per plans. No change to use, egress or occupancy
General construction related to interior office renovation at the 25th & 26th floors including demo of existing & construction of new partitions, finishes, doors, ceiling as indica…
Ttd - 42c/44m - filing herewith alt 1 creating a horizontal egress/ area of refuge to increase occupancy and establish pa space.
Minor interior demolition of existing office space, including the removal of partitions, ceilings, floors and finishes on the 12th Floor (Beam Suntory), as per plans. No change to…
Filling herewith for interior demolition and installation of non-load bearing partitions, ceilings, floors, and doors as per plans. No change to use, egress, or occupancy.
Herewith filing for change of use, egress and occupancy for proposed life sciences building. horizontal and vertical enlargements of existing building.
Alt-co on 13-14 for assoc. int. non-bear. part. & finishes. no use change on 13 from pa & business to business only w/ incr. in business occupancy. no use change on 14 w/ incr. in…
Herewith filing for structural removals as per plans. no change to use, egress or occupancy under this application.