Plumbing work filed in conjunction with GC application for bathroom renovation
Plumbing work new water and sanitary connections for restaurant/pizzeria renovation/ no change or egress occupancy
herewith filing plumbing and sprinkler associated to the general construction for the enlargement.
Plumbing work related to the renovation of apartment 4A on 4th floor.
Remove (1) two fixture bathroom (toilet&bathtub) (1) Kitchen sink&(1)Gas range and propose new kitchen sink&gas range at 2nd floor, correct ECB violation#34703747K
Herewith file plans to combine apartments 3l&3k, removal of gas cooking appliances and replacement plumbing fixtures
Sleeve and pipe for sewer
New kitchen and bathroom fixtures on existing rough ins.
Interior renovation of apartment 7C associated with the apartment 7C associated with the PLL Work Scope. No change isn use, egres or occupancy under this application.
Legalize 3pc of bathroom, washing maching and dryer at cellar level. 2pc of bathroom at first floor
Plumbing work type only as a subsequent filing to gc application # m01342368-i1 for renovation of existing bathroom and kitchen in apartment 20c.
Interior renovation of existing commercial space to replace the new cooking equipment, a hand sink and a 3-comp sink, etc.
Cap and remove plumbing fixtures. replace plumbing fixtures. install new plumbing fixtures.
Plumbing fixtures for an existing coffee shop, new sink comp, hank sink, new coffee machine, and and mop sink / no change or egress occupancy
Proposed renovation of plumbing fixtures on existing roughing, and new plumbing fixtures for commercial kitchen in the store retail supermarket/ no change egress or occupancy.
Furnish and install a complete fully operational plumbing system in accordance with nyc plumbing code.
Replace and install new plumbing fixtures as per plan.
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boil…
Installation of plumbing fixtures and sprinkler heads as shown in plans filed herewith.