A. cellar1. create storage room in the cellar as per plan.2. create 2 pcs powder room in the cellar.3. remove existing non load bearing partition wall in the cellar.b. 1st floor1.…
Plumbing work type hereby filed subsequent to the Alt. CO / NB application: B01205418-I1
Herewith to propose pl systems, inconjunction with dob# b01254338-i1
SUBSEQUENT PLUMBING APPLICATION IN CONJUNCTION WITH APPROVED GC #Q01229127-I1. All Plumbing fixtures are new on new roughing. New electric Hot water heaters are proposed.
Proposed interior renovation works for the seven apartments at the existing 3-story mixed-use building as per plan. the general construction work will be filed separately. no chang…
Filing for three-piece bathroom & to cap & remove kitchen sink and gas stove at cellar in-order to resolve ecb violation #: 39143788x, 39143786m & dob violation #: v 051424c24-0135…
Install new sprinkler and plumbing system for new building in conjunction with nb job#421681004. no change in use,egress and occupancy.
Rep & relocate 4 lavs, 4 Wc's, 4 sinks, cap and remove 2 tubs, 4 new showers
herewith filed for plumbing work. installation of bathroom 1- lav, 1 toilet,-1-shower at second floor
Application filing in conjunction with q00636914-i1 for associated plumbing work as per plan. no change of uese, egres and occupancy under this job.
Filing to cap and remove 1 stove 1 kitchen sink 1 lavatory 1 tub and 1 toilet on cellar floor in conjuction with g.c application# q01177060-i1
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing one family dwelling , Filed in conjunction with ALT II app B01129806-I1
Installation of plumbing fixtures in connection with General Construction Application Q01355787-S1. No change in use, egress or occupancy.
Plumbing work in conjunction with general construction work on cellar as per plan. remove ecb violation # 39066166p. no change in use, egress or occupancy
Boiler application filed herewith in conjunction to alt-co application b01231531-i1
Remove all existing plumbing fixtures and roughing. install new fixtures throughout on new roughing as per plans. filed in conjunction with dob now application# q01356413-i1
Herewith filing for plumbing application, filing for removal and direct replacement of existing plumbing fixtures. filing to replace gas stoves on the first floor, and provide gas…
plumbing work
Application filing for in connection with alt-1 job #q01353375-i1 as per plan . no change of use, egress and occupancy.
Filed herewith plumbing work types with sprinkler-plumbing (30-heads or less) in conjunction with dob application #q01267145-i1.