Plumbing work in conjunction with the interior renovation of existing dwelling unit #9G on the 9th floor of a residential building. No change to use,occupancy, or egress.
Plumbing work type hereby filed subsequent to the Alt. CO / NB application: B01205448-I1
Filing Boiler Equipment application subsequent to primary job number X01171295-I1.
Filing Plumbing application subsequent to primary job number B01351376-I1.
Installation of new bathrooms and kitchens also to include new electric water heaters throughout this existing multifamily building.
Emergency structural shoring due to car crashing into the house.
Proposed installation of a fire sprinkler protection system for the cellar & 1st floor only.
Filed herewith plumbing work types with sprinkler-plumbing (30-heads or less) in conjunction with dob application #q01267137-i1.
Scope of work alteration type 2 herewith filing a plumbing application for the direct replacement of plumbing fixtures at all floors. all damaged plumbing lines shall be removed an…
Herewith filing for an interior renovation at floor 002. filing to remove existing kitchen at floor 002. filing to remove and replace bath fixtures at floor 002. no change in use,…
Plumbing work . as per plans. no change in use, means of egress or occupancy in this application.
Propose (3) gas hot water heater and (1) gas boiler at cellar floor & propose (1) gas plp meter as per plan
Plumbing worktype. Work as per plan.
Plumbing plans filed herewith.
Plumbing Plans filed herewith.
Proposed plumbing application to replace and install new fixtures throughout.
Plumbing application herewith filing an application for the removal and direct replacement of plumbing fixtures throughout. installation of new sink at floor 001. no change in use,…
Proposed plumbing plan filed in conjuction with b01201735-s4