Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary pipe scaffold during bldg renovation/enlargement filed separately under app # m01034950. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or e…
Masonry facade work, and sealant application as per plans. No change to use, egress, or occupancy.
Facade repairs to include masonry replacement, repointing and crack repairs, concrete crack and patch repair. No change in use, egress or occupancy.
Masonry facade repairs as per plans. No change to use, egress, or occupancy.
Leak Repairs: replacement of exist. metal rain barriers on the south facade, leak repairs of EIFS system, including parapets and copings, terraces and balconies at north and south…
Propose facade repairs. Scope of application to include: Brick, Sill, Lintel replacements, Mortar Repointing, and shelf angle replacement with waterproofing.
Masonry facade work as per plans to address conditions cited in the DOB and OATH Violations and the Cycle 9 FISP report. No change to use , egress, or occupancy.
Masonry facade work as per plans including windowsill work to assess and address ECB Violation 34071255L and DOB VIOL 040791CD1JG01. No change to use, egress, or occupancy.
Masonry facade work as per plans, including addressing the conditions cited in ECB Violation 35674111L and Violation 39083802L. No change to use, egress, or occupancy.
Masonry facade repairs as per plans. No change in use, egress or occupancy.
Main Roof Replacement, 7th Floor Terrace Roof Replacement, Mezzanine Roof Replacement, Localized Facade Cladding General Repairs
Fisp repairs, parapet replacement, lintel replacement, brick replacement, railing installation, sawcutting & pointing as per plans. no change in use, egress or occupancy.