Kordun Construction Corp
Permits (94)
Plumbing work as per plans filed herewith. no change to use, egress or occupancy.
Nycha boiler- plumbing work as per plans filed herewith. no change to use, egress or occupancy. related applications filed under b00458414, b00463465, b00461894
plumbing modification in the cellar
Nycha boiler- plumbing work as per plans filed herewith. no change to use, egress or occupancy. mechanical application filed under applicaiton # b00463459
Nycha boiler - plumbing work as per plans filed herewith. no change to use, egress or occupancy.
Aviation hs, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler under emergency. no change in use, egress, or occupancy.
Aviation hs, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler under emergency. no change in use, egress, or occupancy.
provide new concrete pads for new Condensate return units and columns repairs as per plans.
NYCHA BOILERS_BLDG#3_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tank, new sump pit and sump pump, and new gas meter assembly and gas pipi...
BLDG#1_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tank, new sump pit and sump pump, and new gas meter assembly and gas piping to gas wate...
provide new concrete pads for new Condensate return units and columns repairs as per plans.
BLDG#1_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tank, new sump pit and sump pump, and new gas meter assembly and gas piping to gas wate...
NYCHA BOILERS_BLDG#3_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters and storage tank, new sump pit and sump pump, and new gas meter assembly and gas pipi...
Install a new sump pump and replace a section of associated piping with new.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
Install a new sump pump and replace a section of associated piping with new.
Aviation hs, installation of temporary sidewalk shed and fence for the emergency temporary boiler. no change in use, egress or occupancy.