Job filed to remove (3) gas boilers located on the cellar floor and install individual gas furnaces for each apartment from the 1st floor to the attic in order to remove ecb violat…
Applicatgion file to install plumbing fixtures & electric cooking equipments at partial 1st floor as per plan. construction and mechanical work under separate application. no chang…
Filed herewith plumbing work types with sprinkler-plumbing (30-heads or less) in conjunction with dob now n.b. application # q01108640-i1.
Filed herewith plumbing work types with sprinkler-plumbing (30-heads or less) in conjunction with dob now n.b. application # q01109310-i1.
Herewith to propose plumbing systems as per plansin coordinations with dob #q01281676-i1
Filed herewith plumbing work types with sprinkler-plumbing (30-heads or less) in conjunction with dob now n.b. application # q01109169-i1.
Plumbing work-type only in conjunction with filing of gc job# b01058543-i1 to remove 3-piece bathroom and remove existing kitchen at cellar; removing illegal condition and remediat…
Existing 1 family building with plumbing work on thecellar, 1st, 2nd floor and attic under this application. thisjob is related to alt2 job # b01381024-i1.2. no change in use, mean…
Propose minor plumbing at existing one-family dwelling as per plans submitted herewith. no change in use, occupancy, or means of egress.
Plumbing filed in conjunction with alt-2 filling for interiorrenovation of ex. commercial space
installation of unit heater and gas service and gas meter installation.
Cap and remove boiler and hwh on cellar floor
Filing for plumbing work to resolve violations(39136639R&39136640Y). Bring back cellar to its original condition by removing partition walls, additional electrical lines, switches…