Mac Felder Inc
Permits (34)
Remove/ replace sprinklers with new heads and piping; install temporary sprinkler protection as per plans. Remove plumbing fixtures and install newon 2nd flor. install med medical gas piping cellar th...
Plumbing: Modifications to the existing plumbing system on the (16th Floors- Orrick) as per plans. No change to use, egress or occupancy.
Plumbing: Modifications to the existing plumbing system on the (16th Floors- Orrick) as per plans. No change to use, egress or occupancy.
Plumbing modifications taking place in the cellar, 1st and 2nd floors as per drawings filed herewith. no change in use, egress or occupancy.
Plumbing modifications taking place in the cellar, 1st and 2nd floors as per drawings filed herewith. no change in use, egress or occupancy.
Install (13) WCs, (9) Lavatories, (4) urinals, (2) DWs, (6) sinks, (1) CM, (2) IM, (8) Floor drains, (4) HWH and associated CW/sanitary piping on the 21st Floor as per plans (RGHQ Relocation.) No chan...
Install (13) WCs, (9) Lavatories, (4) urinals, (2) DWs, (6) sinks, (1) CM, (2) IM, (8) Floor drains, (4) HWH and associated CW/sanitary piping on the 21st Floor as per plans (RGHQ Relocation.) No chan...
Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan.
Application filed for the removal and replacement of two Gas fired water heaters with 5 Electric water heaters located in penthouse level as per plan.
Plumbing work in conjunction with annex demolition.
Plumbing work on the 20th floor (restrooms) as indicated on drawings.
Filing herewith plumbing work at existing 31st floor space. No change in use, egress or occupancy.
Remove fixtures, equipment and piping and restore existing drains in first floor commissary kitchen and locker room. Provide new underslab drainage and grease interceptor for prep kitchen fitout. Prov...
Filing herewith plumbing work at existing 31st floor space. No change in use, egress or occupancy.