Maric Mechanical Inc
Permits (399)
Filing for new concrete pad installation related to the replacement of the hot water equipment per plans filed. no change to use, egress or occupancy.
Filing for new concrete pad installation related to the replacement of the hot water equipment per plans filed. no change to use, egress or occupancy.
Removal of existing tank room mechanical, heating and domestic hot water system. installation of new hot water pumps and associated piping and ducts. no change in use egress or occupancy.
Installation of steam unit heater for boiler replacement. no change to use, egress or occupancy.
Filing for louver replacement, minor facade repair of existing masonry disturbed by louver replacement and pad extension related to boiler replacement/removal per plans filed. no change to use, egress...
Marlboro houses - building #29, installation of +/- 479 linear feet of temporary 8 feet high chain link fence submitting on behalf of contractor. no change in use, egress, or occupancy.
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installa...
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installa...
Replacement of existing vacuum pumps, exhaust fan, sum pumps, piping. Replacement of existing hot water tanks and piping with gas-fired water heaters. New exterior side-wall flue to the roof. Installa...
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
Replacement stairs and doors of boiler plant and tank/pump rooms in kind with existing. replacement concrete equipment pads.
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
NYCHA BOILER_removal of existing concrete entry stairs, installation of new concrete entry stairs and pads for mech. equipment, mounting of risers to exterior facade of the building
Replacement of existing vacuum and condensate pumps, installation of combustion air duct work and flues for new domestic and hot water heaters.
Replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
NYCHA BOILER_Removal and replacement of existing condensate pump concrete pads
Replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.
Nycha boiler_replacement of existing vacuum and condensate pumps, installation of combustion air ductwork and flues for new domestic and hot water heaters.