Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Installation of temporary needle beams as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. filed in co…
Installation of temporary roof protection as per plans. no change in use, egress or occupancy. shall comply with chapter#33 of 2022 nyc building code.
Equipment use: single 6000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app…
Proposed installation of temporary pipe scaffold for new building as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress…
Installation of pipe scaffold for ps 110k at 124 monitor street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Installation of new sidewalk shed for ps 110k at 124 monitor street, brooklyn as indicated on plans. there will be no change in the use, egress, or occupancy under this application…