Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio…
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Pintard hall - facade restoration including localized brick and brownstone masonry repairs, roof replacement, stained and leaded-glass window restoration. no change in use, egress…
Dehon hall - facade restoration including localized brick and brownstone masonry repairs, roof replacement, stained and leaded-glass window restoration. no change in use, egress or…
Facade and exterior repairs as per drawings. No change in use, egress or occupancy is involved under this application.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Application herewith filed for lots 102 & 105 for a temporary construction fence in conjunction with new building q00876017-i1 & existing building alteration q01090674-i1. no chang…
Installation of temporary overhead protection over garage as per plans. no change in use, egress or occupancy.
mechanical split systems for first and eighth floors
Structural and construction work to replace existing first floor and eighth floor rtu's with split systems. New cassettes to be installed at first and eighth floors. See mechanical…
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicati…
Installation of temporary beta max hoist as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Facade repairs as per plans filed herewith
Repair/replace facade as necessary to include masonry, pointing, lintels, and masonry corner reconstruction, as per drawings
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Propose masonry window openings on 6th fl on east facade and 12th floor on east facade at the corner condition.
White hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use, egr…